Skip to content
Construction estimating & takeoff
(574) 203-5345 info@worldestimating.net
World EstimatingTakeoffs & cost estimates
Estimating support for your projectRequest a Quote
Bid support · Trade takeoffs · Budget estimates

Request a Construction Estimating Quote

Request an estimate with your project location, scope and any plans you have. Tell us whether you need measured quantities, a priced estimate or an early budget.

Include applicable addenda and note any alternates or exclusions.

What to send with your request

Send the latest plan link and specify the trades, buildings or bid packages you need covered. Include applicable addenda and indicate whether the request is for a quantity takeoff, a priced estimate or a preliminary budget. The plan link should open the latest issued set — the one the bid must be built from — rather than an earlier revision, because a quantity measured from a superseded sheet is wrong even when the arithmetic is right.

The choice between a takeoff, a priced estimate and a preliminary budget decides what the file will show. A quantity takeoff gives you the measured quantities to price with your own rates; a priced estimate adds the pricing basis, with each quantity carrying a rate applied openly; a preliminary budget is built from a concept or preliminary set, measures what the drawings show and carries the rest as allowances. If you are not sure which one fits, describe the project and the decision the number must support, and the reply will confirm the scope.

How to share your drawings

Drawings can be attached as PDF, ZIP, DWG, DXF, PNG or JPG, up to 90 MB, with several drawings combined into one ZIP file. If the set is larger than that, or if the project is covered by a confidentiality agreement, send the request without an attachment and ask for a sharing method to be agreed first. A link to the drawings works as well, provided it opens for the intended recipient — test it in a private browser window before sending.

Keep the drawings complete. The schedules for doors, windows, finishes and equipment, the specifications and the site plan all carry quantities the plans alone do not show, and a missing schedule is a missing scope. If a sheet is missing or a detail is not yet drawn, say so in the request: the item will be listed as an open item with its basis stated, and the work it covers will be carried as an allowance rather than priced as if it were fully drawn.

What happens after you submit

Once a request arrives, it is reviewed against the drawings, the scope and the bid date, and the team responds with the scope of the estimate and what is needed to start it. If something is missing — a sheet, a schedule, a bid form — the reply will say what it is, so the request can be completed without guessing. The frequently asked questions page covers the common points, including how the fee is determined and what the estimate file will show.

Send the latest plan link and specify the trades, buildings or bid packages you need covered. Include applicable addenda and indicate whether the request is for a quantity takeoff, a priced estimate or a preliminary budget.

Requesting a quote for Structural Steel Estimating Services.

Include your country code, such as +1 for the U.S.

Upload one PDF, ZIP, DWG, DXF, PNG or JPG up to 90 MB. Use a ZIP for multiple drawings. Uploadcare processes the file when you submit.

No drawings yet? Include the project city or ZIP, project type, approximate size and what you need priced.

How your request is handled. We use your contact and project details to review and respond to your request. Uploadcare hosts optional attachments, and the file link is included in the quote email. Anyone with that link may be able to open the file. For confidential or NDA-covered plans, send the request without an attachment and ask us to agree on a sharing method first. Privacy Policy

No drawings yet?

Include the project city or ZIP, project type, approximate size and what you need priced. An early number can be built from the design as it stands, with allowances shown openly for the decisions that are still open, so a choice can be tested before the drawings are finished. If you want to see how an estimate is laid out first, the View Estimating Samples shows a worked takeoff sheet with its quantities, basis and scope notes kept apart.

When the drawings arrive, the early number becomes the check the bid is measured against. The bid is built from the finished set, and the difference between the early number and the bid is visible line by line, so you can see what moved and why. If a question comes up before you send anything, the frequently asked questions page covers what to send, what the estimate file will show and how allowances are handled.