Skip to content
Construction estimating & takeoff
(574) 203-5345 info@worldestimating.net
World Estimating NetworkTakeoffs & cost estimates
Estimating support for contractorsRequest a Quote
Bid support · Trade takeoffs · Budget estimates

Earthwork, utilities and paving

Sitework & Earthwork Estimating

A sitework estimate separates grading, underground utilities and paving. Track cut and fill volumes, pipe and structure quantities and pavement areas so each crew can price its work from the civil sheets.

A sitework estimate needs separate quantities for material in place, imported material and material removed from the job. We keep grading, underground utilities and pavement areas tied to the civil sheets so the contractor can check disposal, haul and compaction assumptions.

Keep export, import and material swell assumptions explicit.

Earthwork, utilities and paving

What the scope can include

  • Clearing and demolition
  • Cut, fill and export volumes
  • Trench runs, structures and backfill
  • Paving and curb limits

What to send with your plans

Send the civil set, existing and proposed surfaces, geotechnical information and any known disposal or import constraints.

Frequently asked questions

Will the estimate include rock or unsuitable soils?

Those quantities depend on the geotechnical basis and bid instructions. Show confirmed material separately and flag any assumed removal quantity.

Can you include alternates for unsuitable soils?

Yes, if the documents identify an allowance, proposed treatment or alternative depth. Keep the quantity basis visible so the bidder can revise it when the geotechnical or owner direction changes.

Request an Estimate View Estimating Samples

What the estimate can show

  • Scope and quantity detail arranged by the trade, system, phase or bid item.
  • Document references so scope questions can be traced to the applicable plans or specifications.
  • Assumptions and exclusions kept visible, with separate pricing or allowances when requested.

Have a bid set ready?

Tell us what you need priced, which drawings govern the bid and when it is due.

Request an Estimate