Construction Estimating FAQs

A takeoff measures quantities. A cost estimate adds pricing assumptions to the measured scope. Use the questions below to clarify which drawings to send, how pricing is scoped and how changes are handled.

Send the latest drawing set and all applicable addenda.

Can I request a quantity-only takeoff?

Yes. Specify the trade, the takeoff units and how you want the quantities broken down. A quantity-only sheet can be priced with your own crews and suppliers.

Which version of the drawings should I send?

Send the latest issued bid or design set and every applicable addendum. If a revised sheet replaces one from an earlier set, identify it in the request.

How is the fee determined?

The quote reflects the trades, drawing completeness, required output and deadline. A single-trade count and a full construction budget are scoped separately.

What happens if a plan detail is missing?

Identify the decision in an assumption or clarification log. Where a placeholder is needed, show the basis and the potential impact so your team can review it.

Can you review a new addendum?

Share the updated sheets, a description of the changes and the original estimate scope so the revision can be identified and quoted.

What should I check before using an estimate?

Confirm that the estimate matches the latest documents, your contract scope and current supplier or subcontractor quotes.