Scope before price
Use the bid form, drawings and specification together to identify base work, alternates and allowances. Flag any requested item that lacks a clear drawing or specification reference.
Bid-form and alternate review
Prepare a construction bid estimate aligned to a particular solicitation, bid form and deadline.
Use the bid form, drawings and specification together to identify base work, alternates and allowances. Flag any requested item that lacks a clear drawing or specification reference.
Compare each trade quote with the measured work and the agreed scope limits. Note items such as freight, testing or equipment connections that a quote may exclude even when the base item is listed.
Tie the estimate total back to the required bid form and identify assumptions still awaiting approval. Keep unit prices and deduct alternates separate so the bid lead can check them before submission.
Send instructions to bidders, bid form, specifications, latest drawings, addenda and any vendor quotes you want incorporated.
Yes. Provide the issued bid schedule so the measured quantities and trade subtotals can be reconciled to the owner’s bid items.
Request an Estimate View Estimating Samples
Carry the base bid, add and deduct alternates and requested unit prices on separately labeled lines. Compare the bid form to the addenda log and mark unresolved subcontractor exclusions so they can be dealt with before the bid is released.
Page 1 shows the division subtotal alongside separate item quantities and costs. Use that layout to see how detail rolls up before mapping a total to a bid form.
Reference file adapted from the WorldEstimating.com sample library.
Open Division-organized commercial estimate PDFTell us what you need priced, which drawings govern the bid and when it is due.